/PRNewswire-HISPANIC PR WIRE/ — On April 18, in honor of National Grid Workers Appreciation Day, PSEG Long Island is taking the time to recognize the effort and dedication of its field staff to ensure power supply.
PSEG Long Island has approximately 700 linemen, both permanent and subcontracted, who work hard to maintain and repair the electric grid. (Credit: PSEG Long Island) (PRNewsfoto/PSEG Long Island)
PSEG Long Island linemen and field staff work in shifts, 24 hours a day, and must be prepared to respond to any emergency call in difficult conditions to ensure safe and reliable electric service to 1.2 million customers on Long Island and the Rockaways.
“PSEG Long Island could not be the most reliable provider of overhead electrical services in the state without our linemen and other field personnel,” said Michael Sullivan, vice president of Electrical Operations for PSEG Long Island. “Whether it’s replacing equipment on a sunny day or working 16-hour shifts when storms, blizzards or other natural disasters occur, we are very grateful for their tireless dedication and effort 24/7.”
PSEG Long Island has approximately 700 line workers, both permanent and subcontracted, who play a critical role in ensuring customers receive the best possible service, as they expect and deserve.
PSEG Long Island
PSEG Long Island operates the Long Island Power Authority’s transmission and distribution system under a long-term contract.PSEG Long Island es una filial de Public Service Enterprise Group Inc. (PSEG) (NYSE:PEG), publicly traded diversified energy company.
Visit PSEG Long Island en:
psegliny.com
PSEG Long Island en Facebook
PSEG Long Island on Instagram
PSEG Long Island en X (antes Twitter)
PSEG Long Island a LinkedIn
PSEG Long Island en YouTube
PSEG Long Island en Flickr
CONTACT:Media Relations Locator
516.229.7248
[emailprotected]
Photo – https://mma.prnewswire.com/media/2959621/PSEG_Long_Island_Lineworkers.jpg
Logo – https://mma.prnewswire.com/media/78314/5923604/PSEG_Long_Island_New_Logo.jpg
FUENTE PSEG Long Island